Sunday, March 9, 2008

We are Ready to go!


Here it is the day before we leave and I haven’t updated the Blog for a…. Long…Long ....Time.

I won’t go into great detail but listed below are the major upgrades/improvements that have been made to the boat:

Engine room:

100 amp alternators for the Engines , New Oil coolers – Exhaust Elbows and “Speed Seal Kits” for the raw water pumps. New Exhaust elbow for the Onan Generator, New Gulf Coast F-1 Fuel Polishing System, 8 Trojan T-105 Golf Cart Batteries, New Water heater, freshwater Pump and Washdown Pump. New Holding Tanks,

Topside:

Manson Supreme 45# anchor, Genesis 1000 Windlass, , Weaver Dinghy Davits, Garhauer motor Lift, Propane storage locker

FlyBridge:

Garmin 492 Chart Plotter, Depth sounder, New Flybridge enclosure, cockpit table

Galley-Salon

Installed Princess 3 Burner Stove/Oven, Microwave, Combo Washer/Dryer, Central Vac, Flat Panel TV , and new Inverter to power it all. Track-it-TV system, Converted Ice Box to Refrigerator/Freezer, new Salon Table

Installed carpet tile throughout boat, New Mattress, Curtins, paint


Starting tomorrow we will be updating our Blog on an almost daily basis